Oil-to-Gas Boiler Conversions

Article Tools

Page 2 of 2

Important points to remember:

  • Don't drain hot water into a toilet.
  • Don't pump old system water onto a lawn, or flower bed.
  • Don't pump old system water into a slop sink without first asking the client's permission.
  • Flush the drainage area with fresh water after draining the system.
  • Flush the wet return lines.
  • Plastic bags and plastic sheets are available to reduce the spread of debris.

Setting the New Boiler

It's the installer's responsibility to ensure that either the boiler removal contractor or the apprentice has cleaned the area prior to the setting the new boiler in place.

The removal contractor, installer and/or apprentice will bring the new boiler into the boiler room. All boilers must be installed on top a 4-in. solid concrete block base.

If the basement floor is unable to support the weight of the new boiler or provide a level installation surface, a new concrete pad must be prepared before the boiler is installed. All boilers must be level and plumb through the use of steel shims only.

The installer will consider the flue pipe before connecting the piping side of the system. Use as few flue pipe fittings as possible. This is a must. Flue piping is normally the largest pipe and the last item to be installed, I urge you to install all vent piping first. You will avoid piping yourself into a corner.

Piping the New Boiler

The installer will install the near-boiler piping according to the boiler manufacturer's instructions.

  1. We pre-cut all supply piping and Hartford loop piping to save time and improve efficiency on the job. (A Hartford Loop is an arrangement of piping between a steam boiler's header and its gravity-return piping). I strongly recommend following the manufacturer drawings inside the owner's manual.
  2. Pipe the skim tapping with a nipple and valve. Use Teflon tape and pipe compound for these connections.
  3. Anytime that an existing pipe needs to be cutout wicking must be used on the new thread in addition to the Teflon and pipe compound.
  4. Never insert an old bushing into an old fitting. This will lead to a leak.
  5. All boilers shall be piped in steel, never copper. Over time copper piping will expand and contract greatly and will inevitably leak.
  6. Build the manifold. The “near boiler” piping is simply that. This is the piping that rises from the system and connects to the existing house supply and return piping.
  7. Install the 2-in. vertical piping for the supply. The minimum size length is 18-in.
  8. Install a 2-in. swing joint. This will allow the main to be pitched in the downward position, and allow condensate to return the heating boiler.
  9. Install a full size tee to the house supply. Lay the tee on its side and connect to the main supply with a full size elbow and union.
  10. Continue on the run to the Hartford loop and return piping.
  11. Setting the tee for the equalizer needs to be done with care. Always refer to the manufacturer's instructions. For this example use the shop drawing.
  12. The tee sizing is crucial, especially when there are two returns. The return piping unions should always be connected above the water line.
  13. Always change the main line vents. The main line vents are usually located at the end of the return piping. It's important that these vents be replaced due to age and rust build up.
  14. Feed the water supply through the return. This method allows cold water to feed trough hot return water and will allow it to temper. Never put cold water into the top of a steam system it could “shock” the system and crack a section. See the diagram below.
  15. Piping a skim set-up is an important step that's often overlooked. Our work involves threading pipe with oil. The boilers we're installing were stored outside with a nice coating of oil within for protection against weather. Somehow we need to get this oil out. A skim set up needs to be placed above the water line and below the top of a section.

The best visual I can give you is to imagine filling a glass upside down. If you fill the glass in this manner the water and whatever floats on top will stick to the roof of the glass. We don't want that, we want the stuff on the top of the water in this case oil to be skimmed off. If we installed a pipe below the roof of the boiler

Cleaning Procedure

Before installing the near-boiler piping, wipe off as much cutting oil as possible with a rag. All steam boilers must be skimmed and thoroughly cleaned after installation.

Do not add any chemicals to the boiler unless a systems engineer specifies them.

Operating Pressure

Set all steam heating boilers to cut-in at 1/2 psi and to cut-out at the lowest pressure possible to get steam to the furthest radiator.

If the air vents are working properly, most steam heating systems will work well with a maximum cut-out pressure of 1-1/2 psi.

Note: Burnham steam boilers now come with a distinctive Pressuretrol that requires a cut-in setting of 2 psi and a differential setting of 2 psi.

Timothy Flynn is CEO of Winters Company, a home services organization based in Cambridge, MA. Winters Company specializes in HVAC service and installations, and kitchen and bath remodeling projects. Winters Company is a member of Nexstar, and a recipient of the Frank J. Blau Financial Award. Flynn is willing to talk about improving sales or new services with any interested contractor. He can be reached at tim.flynn@wintersplumbing.com or 617/765-4876. Steam boiler installation procedures co-written by Al Levi.



Want to use this article? Click here for options!
© 2012 Penton Media Inc.

Back to Top

Featured Videos

More featured videos

Contracting Business eNewsletters

Newest From Hvac-Talk

Why HVAC-TALK?

HVAC-TALK.com is a vibrant, active online community that connects HVAC professionals with a focus on the contracting marketplace.

View Forums

Why Join?

    HVAC-TALK gives contractor suppliers readily available access to the largest online discussion forum in the HVAC contracting market.

Register

Comfortech 2011

Comfortech 2010 Attendee Videos

Executive Editor Terry McIver chats with Comfortech attendees on their impressions of the 2010 show.

Watch videos

Follow us on

Marketplace Ads

Browse Back Issues

May 2012

April 2012

March 2012

February 2012

January 2012

December 2011